Projects

Specialists of the organization created a 3D BIM model of the process pipe-line based on the data of the detailed design documentation.
Clash detection was conducted and isometric drawings was released.

.jpg)
(1).jpg)
.jpg)
.jpg)
Specialists of the organization created an executive "as built" 3D BIM model, generated three-dimensional volume deviation reports.

.jpg)
.jpg)
.jpg)
.jpg)
Specialists of the organization created a 3D BIM model of the transformer substation.
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
Specialists of the organization created a 3D BIM model of the underground mine.
.jpg)
.jpg)
.jpg)
.jpg)

Specialists of the organization created a 3D BIM model of the oil refining unit based on the data of the detailed design documentation.
Clash detection was conducted and corresponding reports prepared.
.jpg)
.jpg)
.jpg)